Ship!


Team gathers the night before Ship Day, 2/19, 5 pm.
Crate is ready, 5 pm


Arm, 6 pm



Checking wiring and pneumatics, 9 pm


Arm, 9:30 pm

Pile all our 'stuff' on the scale: 11 pm
 
Wheels arrive, midnight

Wiring of chassis, 1 a.m. 2/20/2007


Documentation of parts layout, 3 a.m.

Arm joins chassis, 5 a.m
 
All hands assemble, wire and rivet , 5:30 a.m.

Just a few winks, 6 a.m.
 
Arm assembled, ready for testing, 7 a.m.

Testing the lifting system, 7 a.m.
 
Checking the arm following damage, 9 a.m

Assembly and labeling of crate, 10 a.m.
 
Removal of lifting system, 9 a.m.

Final check of robot, noon
 
Just before final crate positioning, noon

Into the crate... 12:30 p.m.



FedEx arrives, 1:30 p.m.


Goodbye, Frodo!

Back to Gallery

Home | Team | Calendar | Gallery | Links | About | News | Docs | Archive | Contact
http://www.muncierobotics.org